High Down, Redland
Wind Project

 

 

Location

High Down, Redland, Cornwall

Summary of site

Cornwall Light and Power is applying for planning permission to install a single wind turbine on land at High Down, Redland.

The proposed scheme will consist of one turbine with a capacity of up to 1.3 Megawatts. The new turbine would have a hub height of up to 50 metres and a tip height of up to 80 metres, and will offset over 1,154 tonnes of CO² emissions every year of its anticipated 25 year life span.

If the proposed scheme is approved, each year the turbine will generate the equivalent energy required by 550 local homes.

Latest information

April 2008

The planning application has been registered with Caradon District Council.

  • A non-technical summary can be downloaded from here

The development team welcomes the views of local people - contact details can be found here.